Sign In | Join Free | My benadorassociates.com
China XIAMEN YINTAI MACHINERY CO., LTD. logo
XIAMEN YINTAI MACHINERY CO., LTD.
XIAMEN YINTAI MACHINERY CO., LTD.
Verified Supplier

7 Years

Home > Front Idler Assembly >

Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts

XIAMEN YINTAI MACHINERY CO., LTD.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts

  • 1
  • 2
  • 3

Brand Name : YT

Model Number : PC100

Certification : ISO9001

Place of Origin : China(Mainland)

MOQ : 1PCS

Price : Negotiable

Payment Terms : L/C,T/T

Supply Ability : 10000 PCS/month

Delivery Time : 7-30 days

Packaging Details : Standard Export Packaging

Model NO. : PC100

Product Name : Idler or Idler Wheel

Finish : Smooth

Hardness Depth : 8-12mm

Material : 40Mn2/40Mn

Color : Yellow/Black

Availability : 10-15days

Contact Now

Komatsu PC100 Excavator Machinery Bulldozer OEM Undercarriage Spare Parts Forge Steel Front Idler Assembly With Heat Treatment


1. What is a Idler?

The CHT idler integrates advanced design and precision manufacturing to deliver unmatched durability and safety: its keyed joint between idler and axle expands the bearing surface and enhances torque transmission, a feature that not only boosts reliability but also aligns the idler’s service life with other undercarriage components—eliminating uneven wear—while the axle’s rotation within fixed bearings significantly reduces friction and wear, further extending the track system’s longevity. Crafted via either alkali phenolic resin sand casting or sodium silicate-bonded sand casting (processes chosen for producing robust, dimensionally stable parts), it undergoes specialized heat treatment to achieve a minimum surface hardness of HRC48-58 and a 4-6mm hardened layer (HRC45), endowing it with exceptional impact and wear resistance even in harsh mining or construction settings. Final precision refinement on a CK5110 large-scale CNC vertical lathe ensures impeccable dimensional accuracy and superior surface finishes, guaranteeing consistent stability and a reliably long service life. In practice, this extended track system lifespan cuts down on replacement cycles, directly lowering workers’ exposure to safety risks during maintenance—proving that enduring performance and workplace safety are inherently linked.



2. Idler Characteristic

2.1 Tech-Driven Durability: Built to Outlast

  • 50% reduced bearing pressure: Drastically reduces bearing load, extending component life by 2x or more and doing away with the hassle of frequent replacements.
  • Splined idler-shaft connection: Locks in unrivaled reliability while aligning the idler’s lifespan with other critical undercarriage parts—avoiding uneven wear that shortens overall system life.
  • Heavy-duty rock guard: Acts as a rugged barrier against dirt, rubble, and debris, shielding vulnerable components from damage that would lead to costly repairs or replacements.

2.2 Efficiency-Focused Design: Minimize Downtime, Maximize Output

  • Detachable bearing blocks with bushings: Enable removal and servicing without disassembling the track, trimming maintenance time by up to 40% and getting equipment back online quicker.
  • Dedicated lubrication injectors: Supply precise lubrication to high-wear surfaces, preventing friction-related failures and cutting down on unplanned downtime.
  • Expanded bearing surface + optimized oil flow: Boosts track stability and responsiveness, even in rough mining conditions where consistent performance is critical.

2.3 Cost-Smart Engineering: Lower TCO, Higher Returns

  • Rotating shaft + stationary bushings: Reduces contact stress and wear, slashing unplanned stoppages that eat into profits and disrupt daily operations.
  • Prolonged track system life: Lowers total mining operational costs by reducing downtime and the frequency of part replacements.
  • 50% less bearing stress: Directly results in fewer bearing failures, reducing both parts costs and repair-related labor expenses.


Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts

3. Design/Structure/Main Dimensions of Installation


Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts

Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts



4. Production Processes

Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts


5. Hot Sale Products

Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts

Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts


6. Our Advantages

  • World-class quality

  • Factory sale directly with reasonable price

  • 35 years' experience in Excavator & Bulldozer spare parts manufacturing

  • Fast delivery within 30 days after contract established

  • Professional sales team, quality inspection and report, maritime logistics guidance

  • After-sale services: video technical support, 24h online support


Are you still troubled by lacking of quality excavator idler? YinTai Parts is one of the professional manufacturers and suppliers of excavator idler in China, who has high quality products for sale. With over 30 years experience and wide expertise, we can assure you the high quality and good performance of our products.


Product Tags:

40Mn2/40Mn Material Front Idler Assembly

      

Komatsu PC100 Front Idler Assembly

      

10-15 Days Availability Undercarriage Spare Parts

      
Quality Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts for sale

Komatsu PC100 Front Idler Assembly with 40Mn2/40Mn Material and Heat Treatment for Bulldozer Undercarriage Spare Parts Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: XIAMEN YINTAI MACHINERY CO., LTD.
*Subject:
*Message:
Characters Remaining: (0/3000)